1. In a Planning form, enter Supporting Details for one time period at a summary level with all other dimensions at detail level.
2. In the report design, create the following columns:
A. A text column to hold the CellText formula for the detail.
B. A hidden data column for the summary time period.
The CellText formula in the text column would refer to the hidden column B for the detail, for example: CellText("Grid1",cur,B,cur)
2. In the report design, create the following columns:
A. A text column to hold the CellText formula for the detail.
B. A hidden data column for the summary time period.
The CellText formula in the text column would refer to the hidden column B for the detail, for example: CellText("Grid1",cur,B,cur)
No comments:
Post a Comment